For this project in Port Monmouth Meever USA made sure there would be a strong foundation by delivering our Sheet Piles along with M20 Connectors.
For this project we delivered our ESZ 19-700 Hot Rolled Sheet Piles in 2 different lengths together with M20 Connectors to make sure it fits the project layout perfectly. We delivered a total of appr. 270.000 lbs of Sheet Piles!
Want to read more about our products, please click on the following link to see what else we got to offer.